DC fastMercedes-Benz Charging Network24-hour access

Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging

4155 N General Bruce Dr, Temple, TX 76501, USA

350 kW+ charging across 5 charging stalls, operated by Mercedes-Benz Charging Network. $0.49 per kWh listed.

EV charging at Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging
350 kW+5 charging stalls
Mercedes-Benz Charging Network

Charging location

Temple, Texas

CCS1NACS

The record

The station at a glance

Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging is listed as dc fast charging in Temple, Texas, operated by Mercedes-Benz Charging Network. It records 5 charging stalls and CCS1, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
350 kW+
Stalls
5
Connectors
2
Listed price
$0.49

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingRest Stop

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Temple Parking GarageCharging

Temple Parking Garage

Power not listed4 stalls

Temple, Texas· 3.1 mi

J1772
Price not listedIndependent
Charging

Bruceville-Eddy RV Park

Power not listed1 outlet

Bruceville-Eddy, Texas· 13 mi

NEMA 14-50
$0.18 /kWhIndependent
EV charger at Barrow Brewing CompanyCharging

Barrow Brewing Company

Power not listed3 stalls

Salado, Texas· 18 mi

J1772NEMA 14-50
Price not listedIndependent
EV charger at Kingdom Life ChurchCharging

Kingdom Life Church

Power not listed4 stalls

Killeen, Texas· 24 mi

J1772
$0.30 /kWhGO-STATION

Temple Parking Garage is 3.1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

400 kW peak here

22 min10% to 80%

The car asks for 195 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging

Where is Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging?

Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging is at 4155 N General Bruce Dr, Temple, TX 76501, USA.

How fast can I charge at Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging?

Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging lists a peak of 350 kW+ (DC fast) and CCS1, NACS connectors.

How much does charging cost at Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging?

Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging quotes $0.49 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging have?

Buc-ee's Temple, TX | Mercedes-Benz High-Power Charging lists 5 charging stalls. It is listed as open around the clock. Live availability is not tracked.