Level 2OpConnect24-hour access

Great Lakes Energy Co-Op Wayland

1049 133rd Ave, Wayland, MI 49348, USA

15.4 kW charging across 2 charging stalls, operated by OpConnect. $0.15 per kWh listed.

EV charging at Great Lakes Energy Co-Op Wayland
15.4 kW2 charging stalls
OpConnect

Charging location

Wayland, Michigan

J1772

The record

The station at a glance

Great Lakes Energy Co-Op Wayland is listed as level 2 charging in Wayland, Michigan, operated by OpConnect. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
15.4 kW
Stalls
2
Connectors
1
Listed price
$0.15

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at ExxonDC fast

Exxon

200 kW4 stalls

Wayland, Michigan· 4.5 mi

CCS1NACS
$0.49 /kWhMonta

Best Western Plus Wayland is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 15 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Great Lakes Energy Co-Op Wayland

Where is Great Lakes Energy Co-Op Wayland?

Great Lakes Energy Co-Op Wayland is at 1049 133rd Ave, Wayland, MI 49348, USA.

How fast can I charge at Great Lakes Energy Co-Op Wayland?

Great Lakes Energy Co-Op Wayland lists a peak of 15.4 kW (Level 2) and J1772 connectors.

How much does charging cost at Great Lakes Energy Co-Op Wayland?

Great Lakes Energy Co-Op Wayland quotes $0.15 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Great Lakes Energy Co-Op Wayland have?

Great Lakes Energy Co-Op Wayland lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.