Level 2ChargePoint24-hour access

Mortensen Company

300 Park Blvd, Itasca, IL 60143, USA

6.5 kW charging across 2 charging stalls, operated by ChargePoint. $0.10 per kWh listed.

EV charging at Mortensen Company
6.5 kW2 charging stalls
ChargePoint

Charging location

Itasca, Illinois

J1772

The record

The station at a glance

Mortensen Company is listed as level 2 charging in Itasca, Illinois, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
2
Connectors
1
Listed price
$0.10

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Westin HotelCharging

Westin Hotel

Power not listed10 stalls

Itasca, Illinois· <1 mi

J1772
$0.30 /kWhIndependent
EV charger at The RDI GroupLevel 2

The RDI Group

10.1 kW2 stalls

Itasca, Illinois· <1 mi

J1772
$0.49 /kWhBlink
Level 2

DSV

6.5 kW2 stalls

Itasca, Illinois· <1 mi

J1772
$0.40 /kWhChargePoint

American Academy of Pediatrics is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Mortensen Company

Where is Mortensen Company?

Mortensen Company is at 300 Park Blvd, Itasca, IL 60143, USA.

How fast can I charge at Mortensen Company?

Mortensen Company lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Mortensen Company?

Mortensen Company quotes $0.10 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Mortensen Company have?

Mortensen Company lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.