Charging stationEV Connect24-hour access

OnPoint EV Charging @ Sugar Land Regional Airport

12888 S Texas 6, Sugar Land, TX 77498, USA

Power not listed charging across 4 charging stalls, operated by EV Connect. $1.00 per kWh listed.

EV charging at OnPoint EV Charging @ Sugar Land Regional Airport
Power not listed4 charging stalls
EV Connect

Charging location

Sugar Land, Texas

CCS1

The record

The station at a glance

OnPoint EV Charging @ Sugar Land Regional Airport is listed as a charging stop in Sugar Land, Texas, operated by EV Connect. It records 4 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
Power not listed
Stalls
4
Connectors
1
Listed price
$1.00

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingAirport

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at TE Harman CenterCharging

TE Harman Center

Power not listed3 stalls

Sugar Land, Texas· 1.1 mi

J1772
$0.45 /kWhEV Connect
EV charger at Courtyard By MarriottCharging

Courtyard By Marriott

Power not listed6 stalls

Sugar Land, Texas· 2.4 mi

J1772NACS
$0.39 /kWhIndependent

TE Harman Center is 1.1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

power not listed · car's own peak

22 min10% to 80%

The record for OnPoint EV Charging @ Sugar Land Regional Airport does not list a peak power, so this is what Audi A6 e-tron does at its own peak. A good DC post gets close.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at OnPoint EV Charging @ Sugar Land Regional Airport

Where is OnPoint EV Charging @ Sugar Land Regional Airport?

OnPoint EV Charging @ Sugar Land Regional Airport is at 12888 S Texas 6, Sugar Land, TX 77498, USA.

How fast can I charge at OnPoint EV Charging @ Sugar Land Regional Airport?

The record does not list a peak charging power for this station. It lists CCS1 connectors.

How much does charging cost at OnPoint EV Charging @ Sugar Land Regional Airport?

OnPoint EV Charging @ Sugar Land Regional Airport quotes $1.00 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does OnPoint EV Charging @ Sugar Land Regional Airport have?

OnPoint EV Charging @ Sugar Land Regional Airport lists 4 charging stalls. It is listed as open around the clock. Live availability is not tracked.