Level 2

Switchyard Park - Rogers Parking Lot (1)

Switchyard Park, 1601 S Rogers St, Bloomington, IN 47403, USA

7.2 kW charging across 2 charging stalls. $0.35 per kWh listed.

EV charging at Switchyard Park - Rogers Parking Lot (1)
7.2 kW2 charging stalls
Independent

Charging location

Bloomington, Indiana

J1772

The record

The station at a glance

Switchyard Park - Rogers Parking Lot (1) is listed as level 2 charging in Bloomington, Indiana. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
7.2 kW
Stalls
2
Connectors
1
Listed price
$0.35

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicCity park hours are: open daily from 5am-11pm. This includes the chargers.Free parkingPark

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at 4th St GarageLevel 2

4th St Garage

7.2 kW3 stalls

Bloomington, Indiana· 1.3 mi

J1772
$0.35 /kWhEV Connect
EV charger at Curry Auto CenterDC fast

Curry Auto Center

50 kW1 stall

Bloomington, Indiana· 2.3 mi

CCS1
$0.50 /kWhEV Connect
Level 2

Aspen Heights

6.5 kW10 stalls

Bloomington, Indiana· 2.5 mi

J1772
Price not listedChargePoint

Community Nissan of Bloomington South is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

8 hr 39 min10% to 80%

Audi A6 e-tron takes about 7.2 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 7.2 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Switchyard Park - Rogers Parking Lot (1)

Where is Switchyard Park - Rogers Parking Lot (1)?

Switchyard Park - Rogers Parking Lot (1) is at Switchyard Park, 1601 S Rogers St, Bloomington, IN 47403, USA.

How fast can I charge at Switchyard Park - Rogers Parking Lot (1)?

Switchyard Park - Rogers Parking Lot (1) lists a peak of 7.2 kW (Level 2) and J1772 connectors.

How much does charging cost at Switchyard Park - Rogers Parking Lot (1)?

Switchyard Park - Rogers Parking Lot (1) quotes $0.35 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Switchyard Park - Rogers Parking Lot (1) have?

Switchyard Park - Rogers Parking Lot (1) lists 2 charging stalls. Its listed hours are City park hours are: open daily from 5am-11pm. This includes the chargers.. Live availability is not tracked.