DC fastChargePoint

Bridgeport Charge Center At Park City Ford

65 Sylvan Ave, Bridgeport, CT 06606, USA

100 kW charging across 3 charging stalls, operated by ChargePoint. $0.62 per kWh listed.

EV charging at Bridgeport Charge Center At Park City Ford
100 kW3 charging stalls
ChargePoint

Charging location

Bridgeport, Connecticut

CCS1CHAdeMOJ1772

The record

The station at a glance

Bridgeport Charge Center At Park City Ford is listed as dc fast charging in Bridgeport, Connecticut, operated by ChargePoint. It records 3 charging stalls and CCS1, CHAdeMO, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
100 kW
Stalls
3
Connectors
3
Listed price
$0.62

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Charging

76 Watertown Rd

Power not listed1 stall

Bridgeport, Connecticut· <1 mi

J1772
Price not listedWevo Energy
Charging

52 Peck Rd

Power not listed1 stall

Bridgeport, Connecticut· <1 mi

J1772
Price not listedWevo Energy
Charging

711 E Main St

Power not listed1 stall

Bridgeport, Connecticut· <1 mi

J1772
Price not listedWevo Energy
Charging

380 Horace St,

Power not listed1 stall

Bridgeport, Connecticut· <1 mi

J1772
Price not listedWevo Energy
Level 2

2649 Main St Parking

8.8 kW4 stalls

Bridgeport, Connecticut· <1 mi

J1772
Price not listedIndependent
Level 2

144 Alice St Parking

9.6 kW4 stalls

Bridgeport, Connecticut· <1 mi

J1772
Price not listedIndependent

76 Watertown Rd is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

102.5 kW peak here

32 min10% to 80%

The car asks for 103 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 103 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 45% — about 179 miles of range. Filling right to 100% instead takes 55 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Bridgeport Charge Center At Park City Ford

Where is Bridgeport Charge Center At Park City Ford?

Bridgeport Charge Center At Park City Ford is at 65 Sylvan Ave, Bridgeport, CT 06606, USA.

How fast can I charge at Bridgeport Charge Center At Park City Ford?

Bridgeport Charge Center At Park City Ford lists a peak of 100 kW (DC fast) and CCS1, CHAdeMO, J1772 connectors.

How much does charging cost at Bridgeport Charge Center At Park City Ford?

Bridgeport Charge Center At Park City Ford quotes $0.62 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Bridgeport Charge Center At Park City Ford have?

Bridgeport Charge Center At Park City Ford lists 3 charging stalls. Live availability is not tracked.